Home / Tag Archives: JCB (page 3)

Tag Archives: JCB

JCB Hydradig is RiverRidge’s ‘go to’ machine

JCB Hydradig is RiverRidge go to machine

A JCB Hydradig 110W Wastemaster is helping RiverRidge – the largest independent waste management operator in Northern Ireland – to further improve operational efficiency at its materials recovery facility in its Maydown site in Londonderry. Supplied by JCB dealer, Dennison JCB, the Hydradig is being used to undertake a range …

Read More »

Waste Masters Hire add more JCBs to short term hire fleet

Waste Masters Hire add more JCB telehandlers to short term hire fleet

Rapidly growing short-term waste and recycling equipment hire specialist, Waste Masters Hire Ltd, has added five new machines from the JCB range to its fleet. JCB dealer, Gunn JCB, has supplied Waste Masters with a JS20MH wheeled material handler, a 437 wheeled loader a 457 wheeled loader and two 560-80 …

Read More »

JCB puts safety firmly in focus with new films

JCB puts safety firmly in focus with new films

JCB is heading an industry-wide initiative aimed at improving health and safety within the waste and recycling sectors. In partnership with the Chartered Institute of Waste Management, Biffa, HW Martin Group, EU Skills, Mentor Training and Waste Masters Hire, JCB has produced a series of five ‘WasteWise’ films that promote …

Read More »

World-leading JCB cabs factory project forges ahead

The new JCB Cabs factory takes shape

Construction work on the new £50 million JCB Cab Systems factory is forging ahead as it targets a summer opening. The shell of the 350,000 sq ft plant next to JCB Heavy Products and the World Parts Centre at Uttoxeter is on course to be completed slightly ahead of schedule …

Read More »

One-sided approach pays off for Emtec

JCB teletruck emtec

The introduction of JCB Teletruk technology has allowed Emtec, a leading manufacturer of louvres and acoustic products, to improve operational efficiency by freeing up valuable outside space at its High Wycombe-based production and distribution facility. The outdoor area at Emtec’s High Wycombe site is constricted so the loading yard doubles …

Read More »